|
|
|
|
41 | |
41 | |
0 | |
0 | |
14,081,097 | |
14,081,097 | |
0 | |
28 | |
70 | |
|
|
|
|
|
|
|
|
|
|
Aberlee Wind Turbines |
1,090.13B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Bolton Iron |
1,413.47B SC$ |
|
None |
OK |
115 % |
100 % |
|
|
Laos Pampa Wind Turbines |
1,402.82B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Louth Aluminum |
1,874.91B SC$ |
|
None |
OK |
115 % |
100 % |
|
|
Mentoba Wind Turbines |
1,584.45B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Nuovo Wind Turbines |
1,230.91B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Palmdesert Wind Turbines |
1,493.44B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Telanu Wind Turbines |
1,129.47B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Waterbury Wind Turbines |
1,367.42B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
|
Waterbury Wind Turbines |
1,259.14B SC$ |
|
Some Left |
OK |
115 % |
100 % |
|
No new corporations are currently under construction.
There are no pending requests to locate corporations in Eastern Wing.
|
|
|
|
Back to main country page
|
|
|
|